miércoles, 25 de marzo de 2009

VOLUNTARY WORK OF MAY (scheme)

THE EXTREMADURAN ENVIRONMENT.

INTRODUCTION:
  • What is the environment?
  • Geographical location of the region of Extremadura.

FLORA:

  • What is the flora?
  • Trees, landscapes and autochthonous plants of the zone.
  • The botanical garden of Extremadura in the Castle of Trujillo (location, characteristics, etc).

FAUNA:

  • What is the fauna?
  • Autochthonous animals of the zone.
  • Nature Reserve of Monfragüe in Cáceres (location, characteristics, etc).

POLLUTION:

  • What is the pollution?
  • The increase of the pollution in Extremadura.
  • The tench like indicator of the level of aquatic pollution.

CONCLUSION:

The conclusion will be a summary of the exposed points and a valuation of each one of them.

THE BIG THREE

THE THIRD MEETING TO TREAT THE TOPIC OF THE VOLUNTARY WORK OF MAY.

25/03/09

MINUTES

COMPONENTS:

  • DAVID PÉREZ RODRÍGUEZ.
  • MANUEL SOLER GONZÁLEZ.
  • VIRGINIA ORTIZ HERRERA (secretary).

AGENDA:

1-. We have constructed the information of the work.

2-. We have realised a cheme of the work of the points of witch it is going to trat the exhibition.

THE BIG THREE

THE SECOND MEETING TO TREAT THE TOPIC OF THE VOLUNTARY WORK OF MAY.

24/03/09

MINUTES

COMPONENTS:

  • DAVID PÉREZ RODRÍGUEZ.
  • MANUEL SOLER GONZÁLEZ.
  • VIRGINIA ORTIZ HERRERA (secretary).

AGENDA:

1-. As in the previous meeting it was said, we have fixed the fountains importants and validated. They are the following ones:

THE BIG THREE

sábado, 21 de marzo de 2009

THE FIRST MEETING TO TREAT THE TOPIC OF THE VOLUNTARY WORK OF MAY.

17/03/09
MINUTES.

COMPONENTS:

  • DAVID PÉREZ RODRÍGUEZ.
  • MANUEL SOLER GONZÁLEZ.
  • VIRGINIA ORTIZ HERRERA (secretary).

AGENDA:

1-. We have divided the topic of the work of the following way:

  • MANUEL: The fauna in Extremadura.
  • DAVID: The flora in Extremadura.
  • VIRGINIA: The pollution in Extremadura.

2-. We will obtain the information of the work in internet and in others bools refered to this topic.

3-. In the next meeting we will fix all the valid fountains of information for the work.

THE BIG THREE TEAM.